Thames crossing to be longer and wider

10/10/2018
Chris Ames

The Lower Thames Crossing will now have three lanes in each direction and will nearly double road capacity across the river, Highways England has announced.

The government-owned company has launched a consultation on significantly revised plans for the 14.5 mile link from Gravesham in Kent to Thurrock in Essex via the UK’s longest road tunnel.

What the southern portal will look like

It described the scheme, now estimated to cost between £4.4bn and £6.2bn, as ‘the most ambitious road project since the M25 opened 30 years ago’.

At over 50 feet wide, the 2.4-mile tunnel between Gravesend and Tilbury will be the third largest bored tunnel in the world, Highways England said.

The revised proposals include:

  • Making the whole route a three-lane dual carriageway to improve traffic-flow;
  • A new rest and service area to the west of East Tilbury;
  • A new design for the Tilbury junction, removing the proposed Tilbury link road to reduce traffic on the local road network;
  • An improved junction with the A2.

Highways England said the new link is expected to reduce traffic at the Dartford Crossing by 22%, with 14 million fewer vehicles using it every year and northbound journey times almost halved.

Transport secretary Chris Grayling said: ‘The Lower Thames Crossing will help transform journeys, create new business opportunities in Kent and Essex and unlock productivity across the UK.

‘It will also cut congestion at the Dartford Crossing and improve connectivity from our industrial heartland to our ports in the South East.’

Project director Tim Jones said: ‘For too long the Dartford Crossing has been the only way to get across the Thames east of London. It is a vital gateway, but carries more traffic than it was ever designed for and drivers there suffer from regular delays, severing communities and holding back economic growth.’

What the junction with the M25 in Essex will look like

Highways England said ‘numerous’ measures have been included to reduce the impact the new road will have on local communities, including:

  • Extending the tunnel so the tunnel entrance in Kent is 600 metres further south to reduce the visual impact and protect access to a community church;
  • Lowering road by five to six metres in places to reduce its visual impact;
  • Moving the road 80 metres further east where is passes Chadwell St Mary to increase the distance from residential properties.

However, Darren Shirley, chief executive of Campaign for Better Transport, said: ‘Building a road through protected countryside is not the right way to address the long standing problems of traffic, much of it lorries, through Kent and Essex.

‘A better, and less expensive, solution would be to expand port capacity north of the Thames, improve freight and passenger rail links across the river, and look at measures like distance-based lorry road user charging to better manage traffic.’

Latest Issue

latest magazine issue

ALSO INSIDE:

  • Exclusive: M25 delays data doesn't add up
  • Autonomous vehicles: Life after the hype
View the latest issue


Highways jobs

Highway Condition & Safety Inspection Officer - CMB982e

Grade 10, £33,945- £34,834 per annum
To undertake regular highways safety and condition inspections of the highways network Cumbria
Recruiter: Cumberland Council

Director of Open Spaces, Leisure & Culture

up to £133,569
Enfield is home to an increasingly diverse population we are investing in our places and people Enfield (London Borough), London (Greater)
Recruiter: Enfield London Borough Council

Director of Economy, Transport and Planning

Circa £140,000
Instantly recognised for our maritime heritage and the UK’s only Island city. Portsmouth, Hampshire
Recruiter: Portsmouth City Council

Bicester Garden Town Programme Manager

Grade M
Cherwell District Council
Recruiter: Cherwell District Council

Mechanical Engineer

£36,648 - £39,186 (pay award pending)
You will be required to maintain effective liaison with other professionals and key stakeholders Rotherham, South Yorkshire
Recruiter: Rotherham Metropolitan Borough Council

Driver - Northallerton - (IPT234)

£23,893 to £25,119 per annum pro rata
We also undertake registered Local Bus Services (transporting the public) and community transport journeys. Northallerton, North Yorkshire
Recruiter: North Yorkshire Council

Senior Fleet Compliance Assistant

£26,873-£29,269 per annum
We’re looking for a Senior Fleet Compliance Assistant to join our Fleet Management Team. Skipton, North Yorkshire
Recruiter: North Yorkshire Council

Senior Officer (Traffic and Road Safety) OCC615318

£43,421 - £46,464 per annum
Please note we are actively looking at our ways of working using everything we have learnt and heard from our employees Kidlington, Oxfordshire
Recruiter: Oxfordshire County Council

Senior Officer (Traffic Control) OCC613685

£35,745 - £38,223 per annum
You will take a lead role in creating and implementing traffic signal and information strategies Kidlington, Oxfordshire
Recruiter: Oxfordshire County Council

Officer Traffic Control Centre OCC609561

£29,269 - £32,076 per annum
This role in our team supports the movement of traffic across Oxfordshire by responding to both planned and unplanned events. Kidlington, Oxfordshire
Recruiter: Oxfordshire County Council

Programme Control Officer

£35,745 - £36,648
The ideal candidate will have experience of project or programme management techniques and methodologies. Cumbria / Various
Recruiter: Cumberland Council

Senior NEC4 Contract Supervisor CMB1000e

£44,428 – £45,441
Are you an experienced NEC4 Supervisor? Cumbria
Recruiter: Cumberland Council

Major Projects NEC4 Senior SupervisorCMB999e

£53,775 – £55,963
Are you a knowledgeable or accredited NEC4 Supervisor? Cumbria
Recruiter: Cumberland Council

Driver/Loader (Waste Services)

Grade 6 Level 1 - 4 (£26,224 to £28,725 per annum)
Do you want a rewarding role, working outdoors, as part of a committed and hardworking team? York, North Yorkshire
Recruiter: City of York Council

Senior Highways Engineer (Highway Design)

£43,421- £46,464 per annum
The Highway Design and Regulation Team is integral to preserving the integrity and functionality of our highway infrastructure Princess Buildings, Halifax,
Recruiter: Calderdale Metropolitan Borough Council

Senior Capital Engineer

£43,421- £46,464 per annum
The Highway Capital Maintenance Team is integral to preserving the integrity and functionality of our highway infrastructure Princess Buildings, Halifax,
Recruiter: Calderdale Metropolitan Borough Council

Student Placement Engineer Transportation Infrastructure Service

£23,383 per annum (pay award pending)
You'll complete a series of placements, in different teams. Rotherham, South Yorkshire
Recruiter: Rotherham Metropolitan Borough Council

Workshop Shift Supervisor - Engine Shed Lane - (094739)

£35,745 - £40,221
North Yorkshire Council operates a fleet of about 960 vehicles across North Yorkshire. Skipton, North Yorkshire
Recruiter: North Yorkshire Council

Assistant Technician / Technician / Senior Technician

£25,119 - £33,024
Lincs Laboratory is UKAS accredited to BS EN ISO/IEC 17025 for construction materials sampling and testing Lincoln, Lincolnshire
Recruiter: Lincolnshire County Council

Operations Technician (Career Grade)

£22,737 - £30,296
Lincs Laboratory is a specialist in-house service of the Highways Services of Lincolnshire County Council. Lincoln, Lincolnshire
Recruiter: Lincolnshire County Council

Highways Presents

 


Latest Video