Hammersmith Bridge could take three years to repair13/06/2019 The latest estimate is that Hammersmith Bridge could be closed to motor traffic for as long as three years. |
The Hammersmith Conundrum29/05/2019 With Hammersmith Bridge closed to motor vehicles, Dominic Browne takes the opportunity to look at the concept of disappearing traffic and whether there is a case for keeping the great crossing closed permanently to motor vehicles. |
Hammersmith Bridge closed to traffic indefinitely11/04/2019 One of London's most beautiful landmarks the iconic Hammersmith Bridge, a 132-year-old Grade II listed structure, has had to be closed to traffic indefinitely after safety checks revealed critical faults. |
Hammersmith Flyover works enter final phase16/05/2014 Maintenance works on the Hammersmith Flyover in London are now in the final stage. |
Hammersmith flyunder plan receives support from London Mayor04/03/2014 The Mayor of London Boris Johnson has thrown his support behind plans for a Hammersmith flyunder. |
Costain to carry out Hammersmith Flyover refurbishment works04/11/2013 Costain is currently in the early contractor involvement (ECI) phase of a £70million project to strengthen and refurbish the Hammersmith Flyover in West London on behalf of Transport for London (Tfl). |
Costain to carry out Hammersmith Flyover strengthening03/06/2013 Costain has won the £60 million Hammersmith Flyover strengthening project. |
Serious structural defects keep A4 flyover closed05/01/2012 Transport for London has been forced to keep the A4 Hammersmith flyover closed for further engineering inspections because of serious corrosion of steel supporting cables. |
Subscribe to Highways today to ensure you keep your finger on the pulse of everything happening in the UK road network throughout the year.