Hammersmith Bridge could take three years to repair13/06/2019 The latest estimate is that Hammersmith Bridge could be closed to motor traffic for as long as three years. |
The Hammersmith Conundrum29/05/2019 With Hammersmith Bridge closed to motor vehicles, Dominic Browne takes the opportunity to look at the concept of disappearing traffic and whether there is a case for keeping the great crossing closed permanently to motor vehicles. |
Hammersmith Bridge closed to traffic indefinitely11/04/2019 One of London's most beautiful landmarks the iconic Hammersmith Bridge, a 132-year-old Grade II listed structure, has had to be closed to traffic indefinitely after safety checks revealed critical faults. |
Hammersmith Flyover works enter final phase16/05/2014 Maintenance works on the Hammersmith Flyover in London are now in the final stage. |
Hammersmith flyunder plan receives support from London Mayor04/03/2014 The Mayor of London Boris Johnson has thrown his support behind plans for a Hammersmith flyunder. |
Costain to carry out Hammersmith Flyover refurbishment works04/11/2013 Costain is currently in the early contractor involvement (ECI) phase of a £70million project to strengthen and refurbish the Hammersmith Flyover in West London on behalf of Transport for London (Tfl). |
Costain to carry out Hammersmith Flyover strengthening03/06/2013 Costain has won the £60 million Hammersmith Flyover strengthening project. |
Serious structural defects keep A4 flyover closed05/01/2012 Transport for London has been forced to keep the A4 Hammersmith flyover closed for further engineering inspections because of serious corrosion of steel supporting cables. |
Exclusive: A quarter of smart motorway schemes fall below safety benchmark
Funding delay 'threatens Network North scheme'
Auditors warned over relief road 'iceberg'
Call to scrap All Lane Running as smart motorway deaths rise