TfL’s £4bn road modernisation programme starts

25/03/2015
Highways Reporters

Transport for London (TfL) is taking a ‘Games-style’ approach to managing traffic as its £4 billion road modernisation programme gets underway.

The programme, which forms part of the Mayor and TfL’s wider effort to achieve a 40% reduction in the number of people killed or seriously injured by 2020, aims to radically improve the efficiency, safety and reliability of the road network. It will deliver leading urban realm, cycling and pedestrian facilities and support new jobs and homes at locations such as Elephant and Castle and Vauxhall gyratory. Congestion will be tackled by improving the network performance at key locations and repairs will be made to ensure London’s roads are fit for purpose.

Leon Daniels, TfL’s managing director of surface transport, said: “Our £4bn Road Modernisation Plan is creating a greener, safer and more attractive London, including a radical improvement in conditions for cyclists. This programme is changing London for the better and we must work with Londoners, businesses, boroughs and others to help people adapt.

“However, just like with the recent upgrades on the Underground, Londoners will find that there are more modernisation projects underway that affect their journeys. Just as we did during the London 2012 Games, we’re utilising the latest technology to manage the road network and limit disruption. We’re also working with businesses to re-time deliveries outside of peak times and are providing a huge range of detailed travel information, advice and tools so that, wherever possible, road users can plan ahead and avoid hotspots.”

The Road Modernisation Plan includes hundreds of transformational projects to improve life in the capital, through the creation of new cycle routes, upgraded traffic signals, crossings, pavements and highways, and build re-designed, safer junctions at Stockwell, Oval, Archway, Vauxhall Bridge and other key locations. This week Londoners backed plans for major junction improvements at Stockwell and Archway and work has begun at Oval junction, including the creation of new segregated cycle lanes.

Some of the key parts of the plan include:


  • 17 major road schemes to create better public spaces and support development and economic growth


  • 33 junction improvement programmes to make them safer for everyone


  • Four new cycle superhighways and improvements to four existing routes


  • A programme to modernise traffic signals and install Pedestrian Countdown to improve road safety


  • Maintenance and modernisation of essential roads, bridges and tunnels including innovative work to repair the Hammersmith flyover


  • Replacing more than 1,000 streets lights each year with energy efficient LEDs and planting more than 500 new trees.


This modernisation represents the biggest investment in London's roads in a generation, and means that the number of projects underway on the city’s streets is increasing significantly.

In response, TfL’s traffic engineers have developed sophisticated traffic management plans to limit the impacts on road users. Sensors are being buried in carriageways across London to detect real-time traffic conditions at junctions and optimise traffic light timings to reduce delays. More than half of all junctions in London now use this ‘SCOOT’ technology, which has proven to reduce delays by up to 12% at each junction where it has been installed, and three quarters will be fitted with it by 2018.

In central London around 90 per cent have now been fitted with the technology and by 2018 virtually all junctions will have it.

Another key part of the work to limit disruption is TfL’s ‘Lane Rental scheme’, which targets roadworks at the busiest locations and busiest times. It is already seeing over 90% of work carried out during quieter periods – reducing disruption.

Latest Issue

latest magazine issue

ALSO INSIDE:

  • Exclusive: M25 delays data doesn't add up
  • Autonomous vehicles: Life after the hype
View the latest issue


Highways jobs

Principal Transport Officer

£63,112 per annum
leading the capital’s largest new regeneration project. Brent Civic Centre (32 Engineers Way, Wembley, HA9 0FJ).
Recruiter: Old Oak and Park Royal Development Corporation

Highway Condition & Safety Inspection Officer - CMB982e

Grade 10, £33,945- £34,834 per annum
To undertake regular highways safety and condition inspections of the highways network Cumbria
Recruiter: Cumberland Council

Director of Open Spaces, Leisure & Culture

up to £133,569
Enfield is home to an increasingly diverse population we are investing in our places and people Enfield (London Borough), London (Greater)
Recruiter: Enfield London Borough Council

Director of Economy, Transport and Planning

Circa £140,000
Instantly recognised for our maritime heritage and the UK’s only Island city. Portsmouth, Hampshire
Recruiter: Portsmouth City Council

Bicester Garden Town Programme Manager

Grade M
Cherwell District Council
Recruiter: Cherwell District Council

Mechanical Engineer

£36,648 - £39,186 (pay award pending)
You will be required to maintain effective liaison with other professionals and key stakeholders Rotherham, South Yorkshire
Recruiter: Rotherham Metropolitan Borough Council

Driver - Northallerton - (IPT234)

£23,893 to £25,119 per annum pro rata
We also undertake registered Local Bus Services (transporting the public) and community transport journeys. Northallerton, North Yorkshire
Recruiter: North Yorkshire Council

Senior Fleet Compliance Assistant

£26,873-£29,269 per annum
We’re looking for a Senior Fleet Compliance Assistant to join our Fleet Management Team. Skipton, North Yorkshire
Recruiter: North Yorkshire Council

Senior Officer (Traffic and Road Safety) OCC615318

£43,421 - £46,464 per annum
Please note we are actively looking at our ways of working using everything we have learnt and heard from our employees Kidlington, Oxfordshire
Recruiter: Oxfordshire County Council

Senior Officer (Traffic Control) OCC613685

£35,745 - £38,223 per annum
You will take a lead role in creating and implementing traffic signal and information strategies Kidlington, Oxfordshire
Recruiter: Oxfordshire County Council

Officer Traffic Control Centre OCC609561

£29,269 - £32,076 per annum
This role in our team supports the movement of traffic across Oxfordshire by responding to both planned and unplanned events. Kidlington, Oxfordshire
Recruiter: Oxfordshire County Council

Programme Control Officer

£35,745 - £36,648
The ideal candidate will have experience of project or programme management techniques and methodologies. Cumbria / Various
Recruiter: Cumberland Council

Senior NEC4 Contract Supervisor CMB1000e

£44,428 – £45,441
Are you an experienced NEC4 Supervisor? Cumbria
Recruiter: Cumberland Council

Major Projects NEC4 Senior SupervisorCMB999e

£53,775 – £55,963
Are you a knowledgeable or accredited NEC4 Supervisor? Cumbria
Recruiter: Cumberland Council

Driver/Loader (Waste Services)

Grade 6 Level 1 - 4 (£26,224 to £28,725 per annum)
Do you want a rewarding role, working outdoors, as part of a committed and hardworking team? York, North Yorkshire
Recruiter: City of York Council

Senior Highways Engineer (Highway Design)

£43,421- £46,464 per annum
The Highway Design and Regulation Team is integral to preserving the integrity and functionality of our highway infrastructure Princess Buildings, Halifax,
Recruiter: Calderdale Metropolitan Borough Council

Senior Capital Engineer

£43,421- £46,464 per annum
The Highway Capital Maintenance Team is integral to preserving the integrity and functionality of our highway infrastructure Princess Buildings, Halifax,
Recruiter: Calderdale Metropolitan Borough Council

Student Placement Engineer Transportation Infrastructure Service

£23,383 per annum (pay award pending)
You'll complete a series of placements, in different teams. Rotherham, South Yorkshire
Recruiter: Rotherham Metropolitan Borough Council

Workshop Shift Supervisor - Engine Shed Lane - (094739)

£35,745 - £40,221
North Yorkshire Council operates a fleet of about 960 vehicles across North Yorkshire. Skipton, North Yorkshire
Recruiter: North Yorkshire Council

Assistant Technician / Technician / Senior Technician

£25,119 - £33,024
Lincs Laboratory is UKAS accredited to BS EN ISO/IEC 17025 for construction materials sampling and testing Lincoln, Lincolnshire
Recruiter: Lincolnshire County Council

Highways Presents

 


Latest Video