Harris corrects evidence to Transport Select Committee

22/07/2021 | CHRIS AMES

Highways England’s acting chief executive has had to write to the MPs to correct his evidence about the time it takes for a stationary vehicle on a smart motorway to be spotted.

Nick Harris wrote to Transport Select Committee chair Huw Merriman following his appearance alongside transport minister Baroness Vere on 30 June.

As Highways has reported, Mr Harris wrongly told MPs that the time of 17 minutes revealed by the AA to detect and confirm a stopped vehicle event was the longest time it would take.

In his letter, Mr Harris conceded that this was in fact the average time in a 2016 study, although he sought to play this down by asserting that ‘this small sample size is not indicative of all of the strategic road network’.

SVD is in fact only fitted across a small proportion of Highways England’s network.

Mr Harris also described a situation where a vehicle must stop in a live lane of a motorway as an ‘unlikely event’.

In fact, Highways England’s evidence to the committee’s inquiry into smart motorways states: ‘In 2019, 50,995 live lane breakdowns incidents were reported on the strategic road network. Half of these took place on conventional motorways, whereas approximately a quarter took place on motorways without a permanent hard shoulder.’

This amounts to approximately 38,000 incidents on motorways a year, not including controlled motorways.

AA president Edmund King said: 'All the figures we quoted to the Committee have been in the public domain and we published a press release in August 2019 outlining these figures. It seems odd that Highways England should now talk about ‘in the unlikely event that a vehicle must stop in a live lane of a motorway’ when 38% of breakdowns on smart motorways occur in a live lane according to the previous Highways England CEO’s evidence to the last Select Committee.

'We also question why Highways England is disputing their own data on live lane stops because a controlled motorway is not the same as a conventional motorway. From the evidence we have seen live lane stops are more likely on smart motorways and therefore the risk and disruption is higher.'

Mr Harris also provided further clarification of Highways England’s slow progress in rolling out SVD technology to detect stationary vehicles on smart motorways.

In 2016 Highways England’s chief engineer Mike Wilson told MPs: ‘We are now confident that it works, and it will be part of the standard roll-out of smart motorways going forward.’

Last month, Mr Harris told MPs that in 2017 Highways England had a programme ‘both for the forward implementation of stopped vehicle detection and the retrofitting’ with a timescale of around five years.

In his letter, Mr Harris claimed that the decision in last year’s Stocktake and Action Plan to fit SVD on every all lane running motorway by March 2023, which was subsequently brought forward by a further six months, ‘represented a significant acceleration to the programme, which had initially been due to complete by the end of RIS2 in 2025’.

Mr Harris added: ‘We were able to make this additional commitment because of the preparatory work that had already been undertaken to develop, test and operationalise the technology.’

Highways England has declined to explain why the stopped vehicle detection timetable slipped so badly between 2017 and 2022, to the point that agreeing to revert to the original date required ‘a significant acceleration’.

Mr Harris also told MPs: ‘The Department for Transport will write to you separately before summer recess, regarding the ORR report into the Quality Assurance of safety data for All Lane Running Motorways received on 28 June 2021.’

Highways InProfile

latest magazine issue
Highways jobs

Principal Transport Planner (Strategy)

£46,731-£49,764
We are looking for an experienced professional to join North Northamptonshire Council as a Principal Transport Planner (Strategy). Sheerness House, 41 Meadow Road, Kettering moving to Haylock House, Kettering Parkway, Kettering NN15 6EY, United Kingdom
Recruiter: North Northamptonshire Council

Highways Capital Delivery Manager

£50,788 - £52,805
To be responsible for the implementation of Welsh Government’s Renewal and Upgrade programme. Baglan, Port Talbot
Recruiter: South Wales Trunk Road Agent

Senior Engineer x 2

£47,532 –£55,620 per annum
Our people are deeply committed to providing excellent services to our residents, doing all we can to make lives as good as they can be. Hounslow (City/Town), London (Greater)
Recruiter: Hounslow London Borough Council

Electrical Design Engineer

Grade 9 £34,314 to £37,938 - Grade 10 £37,035 to £40,476 - Grade 11 £39,513 to £43,693 - Grade 12 £42,708 to £46,731 p.a.
The Construction Consultancy Services (CCS) team provide client-side construction consultancy services across a range of professional disciplines to d Durham
Recruiter: Durham County Council

Park Operations Assistant - Thorndon Country Park

Up to £12540.50 per annum
This is a permanent, part time position on an annualised hours contract. This means you will be contracted to work a minimum of 964.59 hours per yea England, Essex, Brentwood
Recruiter: Essex County Council

Senior Highways Engineer

£50,754 – £53,607 per annum
Our people are deeply committed to providing excellent services to our residents, doing all we can to make lives as good as they can be. Hounslow (City/Town), London (Greater)
Recruiter: Hounslow London Borough Council

Highways Capital Lead

£47,754 - £50,788
To be responsible for management of the Regional Highway Capital Delivery Teams South Wales
Recruiter: South Wales Trunk Road Agent

Senior Development Management Engineer

£37,938 - £44,711
In line with our One Coventry Values, we want to ensure that our communities are represented across our workforce Coventry, West Midlands
Recruiter: Coventry City Council

Head of Highways

£66,366 - £85,284 pa
Highway Operations is a large division within the Planning, Growth & Infrastructure. Enfield (City/Town), London (Greater)
Recruiter: Enfield London Borough Council

Director Highways, Transport & Waste Management

up to £120k
There for Nottinghamshire. There for each other. There for you. Nottinghamshire
Recruiter: Nottinghamshire County Council

Director of Highways and Transportation

£126,909
We’re seeking a dynamic and innovative leader to spearhead our Highways and Transportation services. Essex
Recruiter: Essex County Council

Senior Structures Technician

£32,654 - £36,124 plus circa £2000 - £4000 OT (variable
To lead on the planning, delivery and reporting of the highway structures General Inspection programme. Baglan, Port Talbot
Recruiter: South Wales Trunk Road Agent

Assistant Director of Place Operations

£85,962 to £93,267
Bury is a proud and prosperous borough Bury, Greater Manchester
Recruiter: Bury Council

Career Grade Transport Planner (Carer Grade 6-8)

Grade 06 (£29,093 - £32,654) TO Grade 08 (£37,938 - £41,511)
This is a fantastic opportunity to work for a forward thinking and dynamic transport authority located in the heart of the North West Warrington, Cheshire
Recruiter: Warrington Borough Council

Principal Performance and Assurance Manager

£Competitive
We have an exciting opportunity for a highly motivated Principal Performance and Assurance Manager to join our Senior Management Team SBIM Avonmouth, Bristol
Recruiter: Amey

Principal Construction Manager

£Competitive
We are excited to offer a fantastic opportunity for a Permanent Principal Construction Manager to join our dynamic Area 12 West Yorkshire
Recruiter: Amey

Electrician

£Competitive
We are excited to offer a fantastic opportunity for two Permanent Electricians Tingley, Wakefield
Recruiter: Amey

Principal Engineer – Structures Capital Delivery

£43,693 - £47,754
To act as one of the Agent's technical experts for highway structures schemes and related issues South Wales
Recruiter: South Wales Trunk Road Agent

Senior Engineer Programme Management

£36,124 - £39,513
To support the Principal Engineer ensuring effective co-ordination, programming and contract administration. South Wales
Recruiter: South Wales Trunk Road Agent

Senior Engineer – Structures Delivery

£36,124 - £39,513
To support the Principal Engineer Structures (Capital Works) and deputise if necessary South Wales
Recruiter: South Wales Trunk Road Agent
SUBSCRIBE NOW

Latest Video

Subscribe to Highways today to ensure you keep your finger on the pulse of everything happening in the UK road network throughout the year.

SUBSCRIBE NOW