Toll booths to be removed at Dartford Crossing

12/07/2013 | HIGHWAYS REPORTERS

New free-flow charging technology will be introduced at the Dartford-Thurrock crossing next year.

The new arrangement is expected to ease congestion and improve traffic flow.

This follows two consultations which received overall support from the public for the legal measures to support the new way of charging at the crossing.

Free-flow technology will allow motorists to use the Dartford Crossing without having to stop at barriers to hand over payment. Road users will be able to pay through a variety of methods including telephone, text message, online, and at retail outlets – giving motorists greater flexibility in how and when they pay the charge.

Roads Minister Stephen Hammond said: “The Dartford Crossing is vital to the local and national economy and introducing free-flow technology will cut congestion and improve journeys for the thousands of motorists and businesses who use the crossing every day.

"We are now able to take forward the legislation to make sure charges will be able to be effectively enforced once free-flow charging at the crossing is introduced next year."

Nigel Gray, Highways Agency senior project manager, added: “The crossing continues to bring huge benefits to the economy, which is one of the reasons why there is such a demand.

"We are grateful to all those who responded to each consultation and we remain on track to introduce a free-flow charging arrangement in October 2014.”

The Freight Transport Association says the decision to introduce free-flow technology is long overdue.

However, the FTA has also voiced its concern over the possible lack of a completely effective charging system that will guarantee that all crossing users would be equally liable for charges, stressing that it is important that a system should be in place to ensure that penalties are enforced across the board for all users who deliberately try to avoid the charge.

Highways Agency figures suggest free-flow tolls could cost as much as £21m a year in unpaid charges, mainly from foreign drivers.

Malcolm Bingham, FTA head of road network management policy, said: “FTA has been asking for a long-time for plans for a ‘free-flow’ system at Dartford to be introduced, and considers that this is the appropriate way forward in order to reduce a good deal of administration costs for the freight industry in dealing with tolls, charges and queues at the Crossing.

“We need to be sure thought that the system will work. Undoubtedly, there will be occasions of genuine administrative error which should be dealt with in a sensible and pragmatic way, but there has be a robust system in place to enforce against all those who deliberately avoiding payment.”

Drivers will be encouraged to pay the charge before they use the crossing. But changes made as a result of the consultations will mean that motorists will have longer – now up to midnight on the following day - to pay the standard charge. The penalty charge for non-payment will be £70, with a reduced rate of £35 if paid within 14 days. If the penalty is not paid within 28 days it would increase to £105.

 

Highways InProfile

latest magazine issue
Highways jobs

Senior Highway Engineer (Development Management)

£42679.0000 - £50211.0000 per annum
Senior Highway Engineer (Development Management)Permanent, Full Time£43,960 to £51,718 per annum*Location
Recruiter: Essex County Council

Project Manager (Major Projects)

£44,711 - £47,754
Are you an experienced project professional or engineer with looking to take the next step in your career? Halifax, West Yorkshire
Recruiter: Calderdale Metropolitan Borough Council

Senior Civil Engineer - Roads

£45,894 - £54,952
Are you an experienced engineer looking to support the Scottish Government’s national objectives. Scotland
Recruiter: Transport Scotland

Senior Civil Engineering Technician

Grade 7 £29,093 to £32,654 per annum
We are looking for a flexible individual who has the ability to meet targets and analyse and resolve complex technical problems and formulate a design Durham
Recruiter: Durham County Council

Project Team Manager

£55,147 to £60,676 per annum
We are pleased to be able to offer an opportunity for a role as Design Team Manager Norwich, Norfolk
Recruiter: Norfolk County Council

Clerk of Works

GRADE 08 (£37,938 - £41,511)
Warrington is one of the most successful towns in the country Warrington, Cheshire
Recruiter: Warrington Borough Council

Assistant Projects Engineer

GRADE 06 (£29,093 - £32,654),GRADE 07 (£33,366 - £37,035), GRADE 08 (£37,938 - £41,511)
Warrington is one of the most successful towns in the country Warrington, Cheshire
Recruiter: Warrington Borough Council

Principal Engineer - Traffic Management

£45,718 - £48,710 per annum
At Bath & North East Somerset Council we have one overriding purpose – to improve people’s lives. Bath, Somerset
Recruiter: Bath & North East Somerset Council

Vehicle Technician - Improver

£28,624 - £30,060
Transport Services is responsible for all aspects of transport and related services Huddersfield, West Yorkshire
Recruiter: Kirklees Metropolitan Council

Part Time Caretaker and General Hand

Up to £25081.00 per annum + Full Time Equivalent
Part Time Caretaker and General HandPermanent, Part Time£25,081 Per Annum, Full Time Equivalent, equal to £13.00 per hourLocation
Recruiter: Essex County Council

Programme Delivery Office Administrator

Grade 9 £31,344 - £33,253 per annum
At Derbyshire, we have been on a journey to transform the way we deliver highway services to make them fit for the future Derbyshire
Recruiter: Derbyshire County Council

Support Officer - Highways Asset Management Systems

£31,586 - £34,314
We are a forward-thinking organisation dedicated to maintaining and improving our highway infrastructure. Lincolnshire
Recruiter: Lincolnshire County Council

Highways Officer (East)

£31,586 - £34,314
This is an exciting opportunity in an ever-evolving service that is both challenging and rewarding. Lincolnshire
Recruiter: Lincolnshire County Council

Principal Transport Planner (Strategy)

£46,731-£49,764
We are looking for an experienced professional to join North Northamptonshire Council as a Principal Transport Planner (Strategy). Sheerness House, 41 Meadow Road, Kettering moving to Haylock House, Kettering Parkway, Kettering NN15 6EY, United Kingdom
Recruiter: North Northamptonshire Council

Electrical Engineer

Grade 9 £34,314 to £37,938 - Grade 10 £37,035 to £40,476 - Grade 11 £39,513 to £43,693 - Grade 12 £42,708 to £46,731 p.a.
The Construction Consultancy Services (CCS) team provide client-side construction consultancy services across a range of professional disciplines to d Durham
Recruiter: Durham County Council

Head of Highways

£66,366 - £85,284 pa
Highway Operations is a large division within the Planning, Growth & Infrastructure. Enfield (City/Town), London (Greater)
Recruiter: Enfield London Borough Council

Director Highways, Transport & Waste Management

up to £120k
There for Nottinghamshire. There for each other. There for you. Nottinghamshire
Recruiter: Nottinghamshire County Council

Assistant Director of Place Operations

£85,962 to £93,267
Bury is a proud and prosperous borough Bury, Greater Manchester
Recruiter: Bury Council

Principal Performance and Assurance Manager

£Competitive
We have an exciting opportunity for a highly motivated Principal Performance and Assurance Manager to join our Senior Management Team SBIM Avonmouth, Bristol
Recruiter: Amey

Principal Construction Manager

£Competitive
We are excited to offer a fantastic opportunity for a Permanent Principal Construction Manager to join our dynamic Area 12 West Yorkshire
Recruiter: Amey
SUBSCRIBE NOW

Latest Video

Subscribe to Highways today to ensure you keep your finger on the pulse of everything happening in the UK road network throughout the year.

SUBSCRIBE NOW